- Trusted Seller
Tetra Pak TBA21 1000B Filling Machine
- Manufacturer: Tetra Pak
- Model: TBA21
under repair Shape of bag: 1000B | Production capacities: 7000/H | Runtime: 40000H
Chengdu, China - Trusted Seller
Tetra Pak TBA19 200B Filling Machine
- Manufacturer: Tetra Pak
- Model: TBA19
Shape of bag: 200B | Production capacities: 7500 | Brief: Overhaul in progress. Running time: 10073h
Chengdu, China - Trusted Seller
Tetra Pak A3Flex Filling Machine 160V
- Manufacturer: Tetra Pak
- Model: A3 Flex
Production capacities: 9000 packages/hour
Chengdu, China - Trusted Seller
1997 Tetra Pak TBA8 Filling Machine
- Manufacturer: Tetra Pak
- Model: TBA8
Production capacities: 6000 packages/hour | Sales manager: Xiang, 18116565391
Chengdu, China - Trusted Seller
STORK aseptic cold filling production line
- Manufacturer: Stork
Production capacities: 6000-12000 | Capacity: 200ml-1.5L
Chengdu, China - Trusted Seller
Bailey bag filling machine DJ-2A
- Manufacturer: Bailey
Production capacities: 6000-7200 bags/H, 200-1000ml
Chengdu, China - Trusted Seller
2017 Ecklin EL2A-2160501 Filling Machine
- Manufacturer: Pickering
Chengdu, China - Trusted Seller
Tetra Pak TBA21 1500S Filling Machine
- Manufacturer: Tetra Pak
- Model: TBA21
Repair and renovation in progress. Production capacities: 8000/H | Shape of bag: 1500SLIM
Chengdu, China - Trusted SellerChengdu, China
- Trusted SellerChengdu, China
- Trusted Seller
2003 Zhongya 6-cup filling and sealing machine
- Manufacturer: Central Asian
Production capacities: 6000
Chengdu, China - Trusted Seller
2016 Samsung PE Lactobacillus Drink Filling Machine
- Manufacturer: Samsung
Production capacities: 36000/h | Brief: Korea Samsung PE filling and sealing machine! This machine is suitable for the production of 100 ml lactobacillus products with a capacity of up to 36,000 bottles per hour.
Chengdu, China - Trusted SellerChengdu, China
- Trusted SellerChengdu, China
- Trusted Seller
Tetra Pak TBA21 1000SQ Filling Machine
- Manufacturer: Tetra Pak
- Model: TBA21
Shape of bag: 1000SQ Diamond Pack | Production capacities: 8000 | Brief: Out of water package, running time: 30,955h
Chengdu, China