- Trusted Seller
2017 NOV CBC – 2x4 / TOS - 1 - Crown Block Cluster
- Manufacturer: NOV
Crown Block Cluster. 2 x 4 CBC Sheaves 3390 mm Ø, 1 x TOS 3416 mm Ø, for Dual Purpose 450 Te SWL Drawworks New/Unused. The TOS (Turn Over Sheave) is equipped with a shear-type load cell to measure the load on the...
Norway - Trusted Seller
2003 Aker Maritime Hydraulics Dead Line Drilling Compensator
- Manufacturer: MHWirth
Deadline heave compensator, Aker M.H., Rated 250 MT (+/- 30 MT), Comp. Capacity: 226 MT hook load, Stroke: 5.4 m / 17.7 ft The deadline compensator is a back-up system for the in-line compensator system. The syst...
Ågotnes, Norway