
CPS ES-1.6MW/3.34MWh-EU - CHINT POWER
All in one design, without on-site installation and commissioning; 6 battery racks, modular PCS etc. are integrated in a 20ft container; Rack-level management allows the racks to run independently, eliminating th...
Shanghai, China
CPS ES-2MW/2.4MW-EU 2/4h - CHINT POWER
Fully integrated system with minimum on-site instllation and commission efforts; High energy density: 5MWh in one 20ft container, 2.4MW PCS skid in one 20ft container; Modular design, reducing O&M costs, easy to ...
Shanghai, China
CPS ES-5015KWH - CHINT POWER
Fully integrated system with minimum on-site installation and commission efforts; High energy density: 5 MWh in one 20ft container Multiple-point electrical linkage measures; Easy to expand with CPS‘s modular and...
Shanghai, China

